Ramako
Moderator
So this is at the Site Plan Approval stage...
What are the remaining procedures for construction?
Finding an anchor tenant.
So this is at the Site Plan Approval stage...
What are the remaining procedures for construction?
Right, but then again a reasonable anchor tenant will pick design and location before 16York
Right, but then again a reasonable anchor tenant will pick design and location before 16York
Hahaha your kidding, since when??16 York is the better location.
16 York is the better location. It makes sense that it's the first to market.
I dunno, I'd say it's a toss up. 16 York is steps from the south side of Union; this development steps from the north side.Hahaha your kidding, since when??
So 81 Bay, 160 Front, and 16 York are all competing for anchor tenants at the same time.... this will be interesting.
Have to say; after this redesign, I'm rooting for 81 Bay.
Come on drop it, 16 York has been proposed, approved, and re-designed for the past 10 years and nothing, if it was that jewel you want us to believe, it would have been built and fully leased3 of the top 5 tallest buildings in the world by 2019 only matters here. I look at it as 16 York being right in the middle of one of the biggest commercial booms in the city's history to a tower west of University. The repetitive floor plan for 16 York is also pretty attractive to a larger, frugal tenant. Despite the better location being southwest instead of far west, 16 York will probably be cheaper too.