Toronto 12-24 Leith Hill | 37.83m | 9s | Starlight | Arch. Unfolded

That's smartly slimmed down.

42
 
This one is now 11 storeys, and slimmed down significantly: Development Application
leithhill.JPG
 
After a few months of quiet..............this one resurfaces with a Refusal Report headed to the March 1st meeting of NYCC.

Report here: https://www.toronto.ca/legdocs/mmis/2021/ny/bgrd/backgroundfile-163871.pdf

From said report:

1613419235840.png


My read here is that separation distances really play into this.

This is reflected by this section of the report:

The proposed setbacks for the 11-storey building are 7.5 metres from the northand east property lines. The proposed 11-storey building is set back 10 metres at grade from the existing 16-storey residential building, where the principal windows for existing tenants are located.As the 11-storey building increases in height, separation distances to the existing 16-storey building increase, but they do not increase sufficiently enough to meet the intent of the tall buildings policies of the Official Plan. The proposed setbacks of the 11-storey building are not adequate and do not ensure a compatible development between tall buildings. Given the siting of the 11-storey building and its location interior to the lot and adjacent to other development sites, an improved building siting and relationship between the buildings is required, including a greater separation distance to adjacent property lines. The 11-storey building does not frame the site in good proportion, and the building massing as it relates to the relationship and compatibility with existing buildings, proposed landscaped areas, and surrounding existing developments is not supportable.
 
Don't think I see an updated elevation drawing, so I'll throw a couple in.

1613419489736.png

1613419524725.png
 
  • Like
Reactions: PMT
Further Revisions to this one, new Arch Plans from June 2021.

Lobbyist hired this month to advocate.

1639680032201.png

1639680063316.png

1639680089036.png


Cover Letter shows the following changes:

1639680180919.png
 
No sooner do I post the above than find that a Final Report on this one, recommending approval is headed to the January 6th meeting of NYCC.

Not sure why they hired a lobbyist at this stage..............


Ohhhhhhh

Planning still doesn't like this.............they are bringing the approval forward at Council direction!

1639687687387.png

1639687706366.png
 
Hmmm, did someone's cheque not clear?

1708804794248.png


They did get the demo permit:

1708804830902.png


But most progress on permits seems to have stopped late spring/early summer '23.
 

Back
Top