Toronto 11 YV | 213m | 62s | Metropia | Sweeny &Co

Today

IMG_2396.jpeg


IMG_2392.jpeg


IMG_2386.jpeg
 
When I took those shots, I saw that the highest number on the construction elevator was 51. Then there were a couple of unnumbered floors above, plus about 3 or 4 floors above those, hidden under the scaffolding (hard to tell the exact number due to the scaffolding). So I’d say they’re on 56 or 57. 5-6 more floors to go plus mech levels.
 
Last edited:

Back
Top