Toronto 101 Erskine Condos | 106.07m | 32s | Tridel | CS&P

  • Thread starter TheAlmightyFuzzy
  • Start date
they are as they don't need to go through the lengthly 12-18 month sales process. It doesn't help that some projects that struggle a bit more in the sales department can take much longer, like 101 Erskine did.
 
Finally! What's next, Redpath starting construction?

I'm a big fan of this one, architecturally.

You win! It is Redpath 155 that is next!

edit: Though technically it is just in the demolishing phase, not the breaking ground phase. I suppose I still got a chance at being right if Montgomery begins the breaking ground phase first. (How do you even determine that point with the facade being protected? :p)
 
Last edited:
I live across the street from the 101 Erskine site.

Since I have an interest in the construction of buildings, I have set up a time lapse camera looking down on the construction site. It also has a live web-feed which refreshes every 5 seconds.

www.cjhoyle.com/torontoview (second image on the page)

The first image is my view of the Toronto skyline which also shows the progress of 30 Roehampton in the top right.

I'm looking forward to continue to track the progress of 101 Erskine.
 
IMG_3009.JPG
 

Attachments

  • IMG_3009.JPG
    IMG_3009.JPG
    2.5 MB · Views: 2,172
March 20:

20160320_175733.jpg
20160320_175839.jpg
 

Attachments

  • 20160320_175733.jpg
    20160320_175733.jpg
    543.7 KB · Views: 1,193
  • 20160320_175839.jpg
    20160320_175839.jpg
    474.4 KB · Views: 1,206

Back
Top