mildlyamusingusername
New Member
How’s it compare to the QQW location?
The tunnel will generate $83,250.00 in annual revenue? Maybe I need read the details.If one goes WAAAAY back in this thread you can see the tunnel during construction as this was a cut and cover project.
TE3.21 - Encroachment Agreements - Pedestrian Tunnel and Vehicular Tunnel under a Future Public Highway, to be named Downes Street, connecting 100 Queens Quay East to 55 Lake Shore Boulevard East
If anyone intrudes into City space (i.e. with a tunnel under a road) there is a fee. Hence the $83,250.The tunnel will generate $83,250.00 in annual revenue? Maybe I need read the details.
It was a little challenging trying to find the Farm Boy parking last night when the LCBO had their preferred parking and FarmBoy was just referred to as retail Parking P2. (Or P1?)I took the escalator up two levels but took the wrong elevator only one level down. Then found the correct elevator to the underground parking. Free 1hour parking automatically printed on every receipt over $15.
A wet miserable night. I should have taken DSC’s advice to go today. I would recommend maybe going Saturday or Sunday as they should be selling off all their overstock. Only a few people there at 8:00 pm last night. >20 staff.
Very nice store. Hey it’s new and clean and spacious with only a hand full of customers on day 1.
Wow. Per year. Who fixes the leaks? Just in case they need bollard protection in the future (eg union station)If anyone intrudes into City space (i.e. with a tunnel under a road) there is a fee. Hence the $83,250.
The new East-West Street is Downes St, the new North-South street is John M Tinsley Street. See map at post here: https://urbantoronto.ca/forum/threa...1m-70s-menkes-a—a.26744/page-123#post-1908775I am assuming that Downes Street is the new north-south street on the east side of this project though, labeled New Street, and not the east-west street as shown on this image?
The east-west street is the extension of Harbour.
42
Yes, as was already acknowledged in the two posts below the one you quote!The new East-West Street is Downes St, the new North-South street is John M Tinsley Street. See map at post here: https://urbantoronto.ca/forum/threads/toronto-sugar-wharf-condominiums-phase-1-231m-70s-menkes-a—a.26744/page-123#post-1908775
The tunnel will generate $83,250.00 in annual revenue? Maybe I need read the details.
It was a little challenging trying to find the Farm Boy parking last night when the LCBO had their preferred parking and FarmBoy was just referred to as retail Parking P2. (Or P1?)I took the escalator up two levels but took the wrong elevator only one level down. Then found the correct elevator to the underground parking. Free 1hour parking automatically printed on every receipt over $15.
A wet miserable night. I should have taken DSC’s advice to go today. I would recommend maybe going Saturday or Sunday as they should be selling off all their overstock. Only a few people there at 8:00 pm last night. >20 staff.
Very nice store. Hey it’s new and clean and spacious with only a hand full of customers on day 1.
Having competition and choice is good, although I find both brands $$.
The fastest way in or out of Farm Boy is via the northern entrance on Downes Street - entering via the Queen's Quay entrance does give one a long tour of the other parts of the 2nd floor but, apart from a great view over the main lobby, is none too exciting.Hah we just missed each other then! My wife and I went around 8:30 (probably didn't get in till 8:45). We walked, but found the street entrance not so obvious in the northwest corner of the building. The south (lobby) entrance on Queens Quay also works though - we checked afterwards. It was nice inside - clean and bright - and really quiet when we were there, there were probably more staff than customers! We swung by Loblaws afterwards and there were noticeably more people there. Having competition and choice is good, although I find both brands $$.