ProjectEnd
Superstar
There is a knock out panel on P2 to the south (for a potential connection to the future GO Station there) but nothing to the east. And given the proponent behind 400 Front, the likelihood of that happening is essentially 0.Are there any plans for a future underground connection between the well and whatever gets built on the other side of Spadina? It would be incredible if the well was eventually connected to PATH