MetroMan
Senior Member
^ The height can't be incremental. All the tracks, starting from the North wall to the South wall need to have the required clearance.
You can either have ramps or you can have the landings of the bridge start well before the tracks in which case an incremental height increase would work as long as it reached the required clearance at the beginning of the span on each end.
You can either have ramps or you can have the landings of the bridge start well before the tracks in which case an incremental height increase would work as long as it reached the required clearance at the beginning of the span on each end.