News   Nov 15, 2024
 228     0 
News   Nov 15, 2024
 657     0 
News   Nov 15, 2024
 383     0 

steveve's Toronto city model

Seriously, this needs to be in city hall.
Steveve, have you thought of selling or loaning this to the city? The proceeds can be used to pay your university tuition.
Heck, maybe you can do some deal with UofT in exchange for free tuition.
 
Seriously, this needs to be in city hall.
Steveve, have you thought of selling or loaning this to the city? The proceeds can be used to pay your university tuition.
Heck, maybe you can do some deal with UofT in exchange for free tuition.

LOL!. as of now i don't know what to do with it nor do i really know what i want to go in to... in the future i'll probably donate it somewhere or just keep it... it's hard to put a value on it because the cost to built it was basically free, :p

Right now i don't have to worry about any of that... First i need to get this thing built! haha
 
Update December 10, 2011:

Boutique Condos are built and the Entertainment District continues to grow... Theatre Park and Studio Condos are soon to follow,

6488886839_281752aa2e_z.jpg


And some different ones:

6488880195_2541a2ab24.jpg


6488884109_de676b8fce.jpg
 
Kicking off 2012 with a fresh sheet of snow on the model.... no, it's actually just paper that i've glued some of the blocks to so they don't keep moving... looking back at it now, it probably wasn't the best colour choice of paper, but for now, it'll do.

Theatre Park (except for the park) is built, as well as a few more blocks in the entertainment district.
And yes, that IS a vitamin water cap where Roy Thompson will be... it's just there as a marker and will be there till a proper one is built... And NO, vitamin water isn't my sponsor!

6620387131_49d2e48780_z.jpg


6620393343_58d6d26175_z.jpg


6620397267_2bf6729d52_z.jpg


6620382445_fa8fe78642_z.jpg


Happy new year! :)
 
It's been a while since an update, but I've got more time now to continue building this thing, and hopefully get weekly updates done.

In this update, Studio Condos are built along with the entertainment district expanding, I think I am gonna leave a few blocks in the entertainment district empty due to the almost certain possibility of future development,
After this, I think I will move north along Yonge St.,

February 7, 2012:

6838186489_ec8067dba1_z.jpg


6838184631_9e16051efa_z.jpg
 
Metro Hall north/south are built, along with some more buildings (including MuchMusic HQ) in the entertainment district, along with the expansion north along yonge street.

I have the block for L tower/Sony Centre built and ready to go, and the Eaton Centre will be a huge addition

Pantages tower will be built, also, I've left out a space for the Massey Tower proposal, still awaiting a design proposal and approval

Update February 11, 2012:

6858704239_0b44bb033b_z.jpg
 
simply amazing.
Can you building something east of Yonge as well?

at the time, i can't build anything further east or west because i've run out of space, so for now it will only be north and south... but yeah, i would definitely like to expand further east/west in the future,
 
Quite a few major additions, including l tower and the Eaton Centre
I'm quite pleased with how l tower turned out and how it looks, I didn't finish the podium details just because i got lazy at the end,
The Eaton Centre was annoying to build. just because it was so huge and you get lazy on detail.

Right now, i could technically build all the way up to Aura pretty fast, although I do want to finish old and new city hall... and most of Front Street south isn't finished yet

Anyway, i hope i can keep up the pace and expand this thing,

February 14, 2012

6877950545_4da971a1e2_z.jpg


6877952929_8b44c456c2_z.jpg


6877955377_9d1b2d4388_z.jpg


6877957563_b6ee5ce435_z.jpg


6877959529_025f237982_z.jpg


6877961203_bc921d1269_z.jpg
 
When you gonna bust out southcore? :)

ya, i was torn between going north vs south... going north means aura and bay street north, and going south means southcore/CN tower... i think i am gonna go north first before heading down south.. because if i head down south, i'm basically pressured to build the CN tower,.. we'll see. maybe i'll build just a few blocks of south core and go north at the same time,:D

if i work hard enough, i can finish the entire board by mid march, and expand from there.. the area of the board probably will cover just north of college, so i'll have to expand

i've been pretty on and off in terms of building.. i think it was about 6 months ago that i built the TD Centre, and expanded from there... if i worked everyday for 10 hours, i could prob finish the entire thing in 2 weeks lol
 

Back
Top