At an open house at St Mikes about 2 years ago they were displaying a plan that showed a 2-storey building and another with floors added to it. I was told that the first phase was the lower floors and that the extra height was phase 2. I assume they are applying now for both phases.Interesting, the proposals we have seen so far is only 2s (though most of us imagined it is designed for far more)
AoD
I don't understand, they want to demolish this?
https://www.google.ca/maps/place/St...f807ec!8m2!3d43.6534274!4d-79.3777415!6m1!1e1