I’m somewhat shocked people are calling for a return to the LRT plan, and making this out to be some massively ridiculous idea to build the full Sheppard Subway from Sheppard W to McCowan/STC.
I’ll chalk up the lack of existing demand east of VP to the suburban character- rather, it is hard to gauge what demand really is for such a large distance when no bus can traverse it quickly. There will also be Line 2 and the Stouffville GO line to interchange with. Furthermore, It’s also not about just Sheppard E; a subway will pull people from Steeles, Finch and Ellesmere- how busy are those corridors?
And, failing all that, I will say this: is it really so bad we build in advance for once in this damn city? Anyone who says we overbuilt it already neglect that we only did so for the fraction we actually constructed. Meanwhile, there is no doubt demand between the two ends of a complete Line 4 will grow steadily if there are connections at both.
Perhaps the extension should not be tunnelled. But is there really a better subway project to prioritize besides extending L4 west, or the Ontario Line north?