chrisw
Active Member
To be clear, the second Round of consultations They need to develop all the options in more detail. Supposedly, almost everything is still on the table currently. (Except for BRT East of McCowan)
Also, a note on the land acknowledgement. There was no presentation, just those boards. The land acknowledgement was on a sign beside the front door.
Also, a note on the land acknowledgement. There was no presentation, just those boards. The land acknowledgement was on a sign beside the front door.