just east of the creek
Active Member
Awesome shots. Thank you. Now to sort out how all of this works.
If it was on the right side that is the new off ramp to mississauga rd.Drove by the site today. it appears as if sections of the bridge have begun arriving on the eastern side for the second span. It also appears as if they are reassembling the 'pull box truss' (does it have a technical term?) on the eastern side as well.
They also appear to be engaging in some express lane readjustment going west bound through the Mississauga Road area, but not sure when it goes into effect.
I saw the new off ramp for Mississauga Road. And no, what I was viewing is in the express lanes driving westbound. The temporary concrete barriers have been removed and lines have been painted or partially painted, suggesting realignment of the express lanes through that same area. i suppose if those lines are shifted to the left, as you head westwards, that will open up further areas for work around the Mississauga exit ramp.If it was on the right side that is the new off ramp to mississauga rd.
Was driving past earlier today (at exceptionally slow speed) and noted that the areas in Bangkok's photos that were being graded and paved, continue to be receiving multiple coats of pavement and it also appears as if lane shifting will take place shortly. I presume west bound lanes will be shifted to the newly paved areas to allow for center barrier work and associated utilities to proceed.Oct 16
View attachment 433506View attachment 433507
While driving home last night I could see that the new lanes in the photo below were being paved.
View attachment 433508