just east of the creek
Active Member
The pedestrian overpass went up sometime in the past couple of days. Sorry, no photos as I was driving.
I honestly would not be surprised if it were completed by November-December. I remember when the new, north bridge was built and I thought that they were like a month away from finishing it and the thing was open later that week!looking quite close to completion overall. I'd guess a Spring 2025 completion.
@Tim MacDonald photos shows it on the west side of the river that goes over the QEWIs the plan still to install a bridge for pedestrians and cyclists below?
Thanks @drum118 , I was wondering about a bridge that crosses the Credit River. For some reason, I had it in my mind that they would be building a separate pedestrian and cyclist bridge below the main deck, although I might be confusing it with the proposal for a multi-use bridge below the Hogg's Hollow Bridge. Where is the crossing for pedestrians/cyclists supposed to be for this project? On the main deck south side?@Tim MacDonald photos shows it on the west side of the river that goes over the QEW
I don't recall seeing steel for it when I could get close to it. If it there, it hung from the main support as this would be a light structure to do after the fact.I'm almost certain it is not there but will do a flight to see.