News   May 09, 2024
 325     1 
News   May 08, 2024
 1.6K     2 
News   May 08, 2024
 1.4K     3 

Progress Place Renovation

...and hopefully that future proposal includes that Beer Store/parking lot next door. In fact, the whole block down to Wellesley for that matter.
 
Except the building with the drug store and Ho's Hair Salon!
 
The entire area is already seeing some pretty intense development pressure - as long as the market remains strong, that should continue.
 
Still incomplete, but work continues

PICT1168.jpg



PICT1172.jpg
 
Thanks for the update dt_toronto_geek!

The problem isn't Progress Place - but the parking lot beside it. If it wasn't there, the Church St. facade would have been just fine.

AoD
 
last time i was by those light things weren't there.. it does look a lot better with it... though the cooler-siding still bugs me.. i think i'm still scarred by Pereguine Point in Edmonton.. 20 stories of cooler-siding....

agreed with AoD... that Beer Store needs to be changed.
 
Too bad they couldn't progress on the font a bit more. What were they thinking using something so boring. A badly kerned Helvetica. This could have looked amazing in a nice Gotham or Neutraface or even if it was a tighter kerned Helvetica light or something.
 

Back
Top