micheal_can
Senior Member
I searched, and there is nothing on this.
So, Let's start discussing this.
So, Let's start discussing this.
I searched, and there is nothing on this.
So, Let's start discussing this.
Can a mod rename this thread to being a poll thread? Ideally, it would be great if the original thread can get the poll and this thread be deleted.
Why can't all these be built at the same time?
Well, there is this finite thing called money.....
That's the plan.Why can't all these be built at the same time?
If DRL is moving, York is going to push it simultaneously. The new corporate plan targets both in the 2028-2032 period, along with Sheppard East LRT.I wish it would happen after the DRL. But I would argue that political expediency means it happens at the same time or even before the DRL.