News   Nov 08, 2024
 335     0 
News   Nov 08, 2024
 770     3 
News   Nov 08, 2024
 456     0 

Pinnacle Uptown: Perla Towers (? Four Springs Ave, Pinnacle International, 34s + 15s, ?)

July 25
More up on site and not all in the same location of shooting.

From the looks of things, owners for the short tower could be moving in this fall and the tall tower by summer 2021
50156775903_2ea623721a_b.jpg

50157568447_7f548eb7d0_b.jpg

50157568777_680f1a5545_b.jpg

50156778308_c96aa5e1af_b.jpg

50157334121_b7bb7972b3_b.jpg

50157334731_ebf52b20c8_b.jpg

50157335136_4845bc519d_b.jpg

50156780543_b7c90fe839_b.jpg

50156780818_465b66ab47_b.jpg

50157335971_b85a0f8347_b.jpg

50157572462_62b80f9080_b.jpg

50156781413_39fe3d4ff0_b.jpg

50157337061_f7b53d6590_b.jpg

50156782448_672c0506dc_b.jpg

50157574202_3cdd7cc8eb_b.jpg

50155600633_ae42e828ba_b.jpg
 
July 25
More up on site and not all in the same location of shooting.

From the looks of things, owners for the short tower could be moving in this fall and the tall tower by summer 2021

More out of curiosity.

Does that mean that owners of the short tower will be in the interim occupancy phase until atleast summer 2021? Or will they still be able to register just one of the buildings and provide final closing before that?
 
More out of curiosity.

Does that mean that owners of the short tower will be in the interim occupancy phase until atleast summer 2021? Or will they still be able to register just one of the buildings and provide final closing before that?

They will probably be registered as independent condo corporations so they don’t need to register at the same time. If they share facilities, they will work out an agreement on how to share the cost.
 
They will probably be registered as independent condo corporations so they don’t need to register at the same time. If they share facilities, they will work out an agreement on how to share the cost.
There is some share facilities since its on the 2nd floor between the 2 towers, but each tower have some for themselves that I know of. I am guessing on time frame, but have seen this happen far too many times on other projects that it will happen here as well.
 
Anyone know if something like this is available for these buildings?
On the Mississauga website they have all the submission related to current developments

 
Anyone know if something like this is available for these buildings?
On the Mississauga website they have all the submission related to current developments

Not sure what you are looking for, but unless some of use post threads for development for some development as noted on the website, they aren't follow or miss. I stop covering a lot of Mississauga like I have with Toronto and covering things more close to me and travel routes. UT has a map for development, but a lot of projects aren't noted on the map
 
Not sure what you are looking for, but unless some of use post threads for development for some development as noted on the website, they aren't follow or miss. I stop covering a lot of Mississauga like I have with Toronto and covering things more close to me and travel routes.


Was looking for some of the Architectural drawings like there are available on the Active Developments Webpage.

For example, the new Phase 5/6 of the Pinnacle buildings have details floor by floor drawings. Is there anything like that for these Perla buildings?

 
Was looking for some of the Architectural drawings like there are available on the Active Developments Webpage.

For example, the new Phase 5/6 of the Pinnacle buildings have details floor by floor drawings. Is there anything like that for these Perla buildings?

Unless they are in the thread or UT Database, no that I know of.
 
anyone knows how long builder takes to close the condo after the occupancy? thanks

It varies vastly between every building, anywhere from 2 months to 1 year. Pinnacle has a good reputation for the most part so you can expect it to be earlier then later.
Are you in the smaller building or taller one? What did they say was your Firm Date?

Occupancy dates for the Taller buildings are Feb - April dates.
 
It varies vastly between every building, anywhere from 2 months to 1 year. Pinnacle has a good reputation for the most part so you can expect it to be earlier then later.
Are you in the smaller building or taller one? What did they say was your Firm Date?

Occupancy dates for the Taller buildings are Feb - April dates.

We got firm revised occupancy by mid October for 15 story tower so I am assuming the final closing would be in Q1 2021.
 
We got firm revised occupancy by mid October for 15 story tower so I am assuming the final closing would be in Q1 2021.

Yeah, I would put my estimate latest end Q1 2021.

But as others have suggested above, it could be much sooner as they will treat each building as a separate entity.

I would love some pictures of the common areas inside once ya do move in :)
 
Yeah, I would put my estimate latest end Q1 2021.

But as others have suggested above, it could be much sooner as they will treat each building as a separate entity.

I would love some pictures of the common areas inside once ya do move in :)
Sure i will post some pictures
 

Back
Top