When has anyone ever used the word "deserve" in the context of Ottawa? The only thing Ottawa "deserves" is a rail system that doesn't break down every 2 months.Le tout Ottawa is waking up and smelling the coffee, and coming to the mass conclusion that Stage Three of light rail, to Barrhaven and Kanata/Stittsville, ain't happening for a long time. The business case just isn't there. CBC Ottawa has a good article on this sad but refreshingly realistic development. It maybe that practical Ottawans are going to refrain from screaming about what they deserve and instead talk rationally about what they really need and can afford.
There have been talks about these things in the context of Central Ottawa and Nepean, but Carling west of Lincoln Fields towards Kanata? News to me. The LRT exists as a way to improve regional travel, a Carling BRT towards Kanata would not serve that purpose well. If we want to invest in local transportation options, we are better off studying completely different corridors such as Montreal Road through Vanier.The consensus seeming to emerge is back to bus RT. Glen Gower, the pragmatic rep for Stittsville and chair of the Transit Commission, has been talking bus for months. Plans are already on the books for enhanced bus ROWs on Carling and Baseline in the western part of the infra-greenbelt, as well as Kanata North (techland) and the south part of Orleans ultra-greenbelt. Maybe these will go ahead instead.
I think it would be best to look at Phase 3 as a set of future projects rather than 1 complete project. Even if all of Phase 3 doesn't make sense, both Phase 3 projects are designed in a way where it can be split into more phases, 3 for Kanata, 2 for Barrhaven. LRT to Terryfox, and maybe Fallowfield will be just fine for now.How will the remaining issues around service to Kanata and Barrhaven be resolved? Many agree that Moodie station doesn't make sense as a permanent terminus since it's basically in the middle of nowhere. The line is already being built part of the way to Eagleson Road, and a terminal there could meet up with a completed BRT system running down from Kanata North, across to Terry Fox, and from there west and south to the rest of Kanata and Stittsville. Or maybe it could go all the way to Terry Fox since the ROW is empty scrub with bridges already in place over it.
Dear god, please anything but that. This will take an already meme-worthy system and make it even more meme worthy. As much as I hate the fact that this system is an LRT, at least it can be described as a hampered metro, with the option on the table for future automation and other goodies. The last thing we need is to hamper the entire network because we decided to save some money, and make 2km of a 30km system at grade.With regard to Barrhaven, one option would be to build a very solid BRT spine from Algonquin (Baseline) to the new Trillium terminus at Limebank in Riverside South and provide very good service on it. It seems a bit of a shame not to extend LRT as far as the bus and VIA station at Fallowfield, but the city's plan for that link is highly compromised. Already high costs have climbed because of the decision to reroute around some lower-income housing (which is now being gentrified via renovictions, according to some reports). In order to save the link, might Ottawa remember that the LRT is actually an LRT and they could very easily run it down the center of Woodroffe at street level between Algonquin and the Sportsplex, much like the Eglinton Crosstown? The stations in that stretch are going to be quite lightly used and median platforms could easily handle the load.
This I agree with, the case for the line beyond Fallowfield isn't there, beyond removing a linear transfer. That being said, "One of the trunk routes doesn't even use the existing transitway", what do you mean by this?Beyond Fallowfield, the business case completely collapses. One of the trunk routes doesn't even use the existing transitway, which is now down to 4 buses an hour off-peak, a service capacity of about 400 pphpd, or 2/3 of a two-car LRT train. Get used to rubber tires, Bushaven.
I'm aware of the Carling LRT plan, but we're talking about a BRT as a replacement to a Stage 3 Otrain Extension, thus implying a BRT between maybe Lincoln Fields and March (or something like that).Carling BRT is designated LRT in the Ottawa Transportation Master Plan and ran eastward from the Confed Line to the Trillium Line, not westward to Kanata.
Barrhaven Town Centre is already being intensfied, and the Transitway going there already grade separated. Fallowfield is a Park n Ride lot with little chance of intensification because it borders the Greenbelt and because of proximity to Ottawa airport. Fallowfield is not the ideal terminus.
I am... absolutely speechless.
Totally agree. The biggest part of the problem is allowing 'experts' who didn't know Ottawa to make critical decisions and Ottawa City Council not questioning those recommendations. The decision to not replace the Walkley overpass to allow double tracking means that the problem of lack of coordination between trains and buses will be perpetuated. OC Transpo seems to have a siloed mentality between rail and bus operations. The end result is unreliable transfers between trains and buses. I have experienced this. You cannot reliably schedule a 12 minute train with a 30 minute suburban bus during off-peak hours. The question remains is it even proven that the promised 12 minute schedule is possible given double length trains having to move slowly off and onto sidings even more times than before? We will see.An inept city like Ottawa is what kind. To be fair the shutdown was supposed to be a lot shorter, but work got started when Covid got started. Another option was to keep the line running during the university year and do the refit during several summers. That was ruled out without discussion. Clearly now like so many things it was a mistake. I don't think Ottawans will settle for any shutdown of the line in future for expansion to enable tighter headways.
The problem with that is that the Ottawa cheapouts made in Stage 2 will render that very tricky. The bottleneck is the decision not to double track Walkley station. Headways could be reduced from 12 to 10 or even less if that had been done, without requiring any more trains. (Not that it's clear it will be necessary soon.) When the line opens, trains will still be dawdling around much more slowly than they need to just to line up with the passing tracks, with long layovers at the terminals and at Carleton. And it's safe to assume they will be mostly empty south of South Keys.