urbanclient
Active Member
Maybe someone with more knowledge can chime in? @drum118 can we really blame it all on North American-spec tracks? Would European-spec wholly solve the premature wear?
If grooved rail would fix everything, why did Alstom agree to resume bearing redesign work (back in 2024... which is slated to be finished by 20XX?)
If grooved rail would fix everything, why did Alstom agree to resume bearing redesign work (back in 2024... which is slated to be finished by 20XX?)




