When is completion date?
When is completion date?
We're thinking of renting in this building. Anyone know how loud the construction is that's still going on?
It's busy 9-4 week days. With only 2 elevators operating. This coming weeks when the mass of renters come into the market. This building is the only brand new one to come onto the market. Compared to last year when 4 new buildings. This building seems extremely rushed and worst quality I've seen in Liberty Village. But prices are cheap compared to everything else in the area.
Thanks so much for the reply! Really appreciated. Do you mind elaborating on the finishes? Is it something a renter would notice/care about or notice? Also, do you know if there's a ton of construction noise 9-4 week days?
Thanks again!
Noise is quite loud, however may not have huge impact if you work 9-5. Only 2 elevator is a pain in the butt. The quality of workmanship is the worst I've seen in a long time - ie. scratches on cabinets from installation, poor finishes on the popcorn/snowtext ceiling - gaps all over. I'm still waiting for my upgraded kitchen backsplash and bathroom mirrors to be installed.
P4 Parking is still incomplete when I was there over the weekend.
picked up my keys last week....this is probably one WORST workmanship I've seen in a long time. My unit was poorly finished with uneven stucco ceiling and visible drywall tape along the edges. Ceiling looked like it was sagging probably from over-spray or uneven concrete form...I'm sure when i go to re-sale the unit, people will think there was water damage in the ceiling! Oh and btw, upgrades were not installed (with unknown time when they will be back)....lots of miscommunication amongst the staff...
This is on par with my experience with Conservatory Group...Horrible workmanship/No attention to detail!
Noise is quite loud, however may not have huge impact if you work 9-5. Only 2 elevator is a pain in the butt. The quality of workmanship is the worst I've seen in a long time - ie. scratches on cabinets from installation, poor finishes on the popcorn/snowtext ceiling - gaps all over. I'm still waiting for my upgraded kitchen backsplash and bathroom mirrors to be installed.
P4 Parking is still incomplete when I was there over the weekend.