micheal_can
Senior Member
I was not suggesting it be done now. This is if Via ever decides to add more routes in the Maritimes. That switch should be done sooner than later. Call me weird, but I don't think a passenger train conductor/engineer should ever throw a switch, unless the switch mechanism is broken.VIA should do none of those things if right now they can’t afford a power switch in Moncton. If New Brunswick wants to, and will pay, perhaps. Given that they seem to have allowed every foot of rail in Fredericton to be turned into trails, I doubt we will be seeing anything close to what’s described.