Allandale25
Senior Member
Hey guys, making my first post here to learn more about Kitchener Line upgrades. It's been somewhat hard to get updates about 2WAD and weekend service on the line all the way to Kitchener, and since Metrolinx doesn't seem to want to share information (which I think is ridiculous), I just don't have much a great understanding of how improvements are going. My understanding is that Metrolinx is adding passing tracks in spots like Breslau (and other areas), the second platform in Guelph (which appears to be almost complete) among other upgrades to bring more service. And from what I gather, the reason we don't get proper weekend service past Mount Pleasant is that a lot of the upgrade work takes place on the Weekends when there is less traffic. Can someone confirm the issues with weekend service, and if CN has any control over it? Another thing I was wondering is what's going on with Silver Junction, and that third track through Brampton. Anyone know how those projects are going/when construction should start and end? And the last thing I was hoping was to get word on when you guys think we'll get at least some Weekend service past Mount Pleasant, and more ambitiously, 2WAD (30 minute freq. each way??) service. It would mean the world for those of us who make the trip on the KI train, and us 30/30A riders (especially UW and WLU students), because those buses are PACKED. Thanks to anyone who has any insight, I know I've got way too many questions.
Welcome to UT!
Some info here a few posts back:
GO Transit: Service thread (including extensions)
BlogTO has a new article up about the E-Bikes on the GO trains. https://www.blogto.com/city/2024/02/go-transit-cracking-down-bikes-trains/
urbantoronto.ca
Also, from the latest Metrolinx board meeting:
GO Transit: Construction Projects (Metrolinx, various)
^ Where's Hanlon? It's the control point at the west end of the new siding, where the Fergus and Preston spurs connect to the Guelph Sub - between Alma and Silver Creek Parkway. - Paul
urbantoronto.ca
And, mentioned here months ago, the design for a third platform at the Brampton Station was been awarded to HDR. Apparently, CN is designing the track. This is definitely a pinch point.
The City of Brampton did some high-level visuals of what the third track would look like. I'll post them in a separate post.