crs1026
Senior Member
The bus does not use the Gardiner. It runs from Burlington Station to Niagara Falls station. That segment is significantly faster by express bus than by express train, even if the bus gets stuck in traffic.
Ah…. Now I see what you meant. Yeah, the train takes a long time to round the bend at Hamilton and the route over the Skyway has a time advantage, although the QEW can get congested over the Skyway.
I would hope that the speeds could be raised eventually, at least from Hamilton eastwards to St Catherines. One concern may be not so much the number of grade crossing as the volume of truck traffic, although there are lots of busy grade crossings elsewhere with higher track speeds.
When ML built the third track from Aldershot to West Harbour, there were constraints that forced some slow stretches and slow speed turnouts. That is unfortunate, but one would hope that the gap can be closed somewhat.
- Paul