Word on the street is that the single track portion of the CN Grimsby Subdivision (CN Nelles in Grimsby to CN Jordan in Jordan) is to be double tracked this spring.
The bridge across Jordan Harbour has already received structural reinforcements and has been double tracked.
This work should hopefully eliminate freight delays that affect Niagara GO trains.
Additionally, new switches are being installed in Niagara Falls and the second track from CN Clifton to the Niagara Falls station is being repaired.