News   Apr 29, 2026
 417     0 
News   Apr 29, 2026
 854     1 
News   Apr 29, 2026
 472     0 

GO Transit: Service thread (including extensions)

COVID and the subsequent housing crisis re-drew a lot of travel patterns.
There's also just lots of latent demand for better train service I think. For instance if VIA was able to run at least hourly clockface service that was generally on time on the corridor routes (so not HSR or even electrification) I suspect there would be a large ridership boost just from that.
 
There's also just lots of latent demand for better train service I think. For instance if VIA was able to run at least hourly clockface service that was generally on time on the corridor routes (so not HSR or even electrification) I suspect there would be a large ridership boost just from that.
How do you expect that to happen when they can't get more track slots?
 
Easily resolved here by digging down the Hunter St. Tunnel and putting in two tracks. One can be dedicated to Mx at all times, the other to CPKC and they can steer clear of one another.
Interested in asking-- usually my first instinct, "intuitive" solution usually are thwarted by some engineering or historical factoid i did not know-- is there really nothing stopping them/making life difficult to just dig the Hunter St. Tunnel two foot deeper or so and laying down two full-height tracks, other than, i dunno, sheer unwillingness to do so?

I am aware the Hunter St. portal has room for two non-full-height track and it formerly used to, or one full-height track.
 
Interested in asking-- usually my first instinct, "intuitive" solution usually are thwarted by some engineering or historical factoid i did not know-- is there really nothing stopping them/making life difficult to just dig the Hunter St. Tunnel two foot deeper or so and laying down two full-height tracks, other than, i dunno, sheer unwillingness to do so?

I'm unaware of any obstacle other than will and money.

But I don't know how much geo-tech has been done, if any, exploring the possibility. @smallspy is more likely to know.

To be clear, under-pinning an old tunnel is theoretically straight forward, but it is, at best, time-consuming and somewhat costly. Depending on soil conditions, and water table height, and what, if anything is underneath.....it could be fairly involved.

It also requires re-grading the trackbed, for a material distance beyond both ends of the tunnel.

I was being a bit cheeky about how easy it is; but at the same time, it shouldn't be all that insurmountable.
 

Back
Top