smallspy
Senior Member
Yes, Metrolinx has long-term plans for quad-tracking all of the way to Burlington West (the interlocking just past Burlington Station). And there are shorter-term plans afoot for building a fourth mainline track through Aldershot.I know it has been discussed; but it strikes me that its not on the near-term radar given that they are comprehensively rebuilding Longbranch station, and not introducing a 4th track.
I had a quick gander, and it looks to me like they have room to fill in the missing 4th mainline track within the ROW and on the embankment, where applicable, as far west as Long Branch station. The first bridge widening requirement appears to be the one over Etobicoke Creek just to the west of Long Branch station.
@reaperexpress could doubtless tell us how far a fourth track extension would have to go, from Mimico, to pickup the first tangible benefit.
But the problem is that the next round of expansion of the corridor beyond Canpa will have to take them all the way to Oakville, as there is no point in stopping short of it. And that's going to include some large bridge projects that are not going to be cheap.
Dan




