robmausser
Senior Member
after RER the total at grade count for each corridor will be as follows:
Kitchener (Union-Bramalea): 0
Barrie (Union-Aurora): 10 road crossings, 5 farm driveway crossings, 1 busway crossing (Finch Hydro Corridor Busway). Total: 16
Stouffville (Union-Unionville): 8 road crossings, 1 pedestrian. Total: 9
Lakeshore East (Union-Oshawa): 3-4 road crossings (not sure if Poplar road will be closed or not), 1 pedestrian crossing. Total: 4-5
Lakeshore West (Union-Aldershot): 9 road crossings.
Total: 30 road crossings, 2 pedestrian crossings, 5 farm driveways, and a busway. 38 level crossings in all.
A lot of these could be eliminated without expensive grade separations mind you. The busway could probably be closed now that the spadina extension is open, frontage roads could eliminate the farm crossings, a lot of the smaller residential crossings could be closed, small ped tunnels or bridges could be built relatively cheap to remove those crossings, etc. Could get it down to the 25 range without a lot of money.
The busway still services the Finch Rocket, which is independent of the spadina extension.