Auraz
Active Member
The whole Emerald City is a ticking time bomb with building defects. Maintenance fees will skyrocket in near future. Tower 1 is about to enter its 3rd week long garbage chute close down due to repair. The 2nd floor stinks of rotten garbage from the compactor room. In its first year, tower 1 suffered at least 4 major floods. The last big one was in Sept 2014 which knocked out all elevators. Speaking of flood, tower 3 suffered its first today with a sprinkle going off inside a unit on 21st floor. It took firefighters over 1 hour to control the flood which went all the way down to P1. Residents in the east end of the tower 3 had to evacuate and deal with severe water damage inside the homes. You can search for "Residents @ Emerald Tower 1, 2, 3 (62, 66, 70 Forest Manor Road, Toronto)" on Facebook to see all the gory details.
Tridel down the street. Built for life.