Dan416
Senior Member
It's time for another poll!
So what's everyone think about what should be done on Eglinton?
Results from Polls #1:
68% voted to replace the SRT with subway to STC
18% voted to replace the SRT with LRT
12% voted to refurbish and extend to Malvern (i.e. the current plan)
Results from Poll #2:
87% voted to finish the Sheppard Subway to STC
8% voted to downgrade Sheppard to LRT and extend to Malvern
4% voted to keep the Sheppard Subway and build LRT to Malvern (i.e. the current plan)
Personally I find it interesting that the route that the TTC has chosen is the least popular option on this forum (excluding Do Nothing).
So what's everyone think about what should be done on Eglinton?
Results from Polls #1:
68% voted to replace the SRT with subway to STC
18% voted to replace the SRT with LRT
12% voted to refurbish and extend to Malvern (i.e. the current plan)
Results from Poll #2:
87% voted to finish the Sheppard Subway to STC
8% voted to downgrade Sheppard to LRT and extend to Malvern
4% voted to keep the Sheppard Subway and build LRT to Malvern (i.e. the current plan)
Personally I find it interesting that the route that the TTC has chosen is the least popular option on this forum (excluding Do Nothing).