Uh ... what did I miss? Wrong thread?
The word is that the engineer had figured out how to deliver Metrolinx's 8th track in two months and at a reduced cost to doing it later, and Giambrone was partly responsible for nixing the idea saying something along the lines of the poor neighbours that have suffered for so long can't handle two more months of construction. With the delay in lowering the bridge it seems they could have actually added the 8th track with little change in the delivery timelines at all.