News   Dec 20, 2024
 1.3K     7 
News   Dec 20, 2024
 936     2 
News   Dec 20, 2024
 1.8K     0 

Cycling infrastructure (Separated bike lanes)

COLLEGE STREET


1724866236398.png
 
(What I assume is a ) "bike lane" NB Bayview between roughly north of Broadway and Glen Valley. There's one SB, too. Just painted lines. So useful!
1000022310.jpg
1000022309.jpg
 
Last edited:
Anyway, back down to Donlands/Pape/Millwood. First the *most dangerous* crossing ever. E-W green, while SB green (to Donlands and Pape, but only one lane). Yes, greens at 90°... slightly unsafe for pedestrians! (I've reported this to 311Toronto).
1000022343.jpg
1000022323.jpg


WB Donlands at Millwood:
1000022326.jpg
1000022327.jpg


And machinery in NB Millwood, presumably to work on the bike lane on the bridge:
1000022328.jpg
e8cf8e75-7f3d-40c6-b19e-7c40f5cc1b9d-1_all_51008.jpg
 
What's the point? Not wide enough for a moped, so cars can't park there. If a taxi/Uber stops there, another car couldn't pass.
Yeah, it looks like they redid the sidewalk and curb here, if the intention is to narrow the lanes to slow cars down, they could have just made the sidewalk wider?

Yeah, from what I can tell looking at this stretch of road on Google Maps streetview and the photos in this thread, the curbs were completely redone (see red lines) to get rid of what is presumably an old bus layby on the west side and the rightmost lane for a bus stop on the east side (both shaded yellow). I am genuinely curious why the new curbs could just not be done at the curb line.

Bayview.jpg
 
Yeah, from what I can tell looking at this stretch of road on Google Maps streetview and the photos in this thread, the curbs were completely redone (see red lines) to get rid of what is presumably an old bus layby on the west side and the rightmost lane for a bus stop on the east side (both shaded yellow). I am genuinely curious why the new curbs could just not be done at the curb line.

View attachment 592269
They got rid of all bus laybies except at the CNIB afaik. Also remove the NB stop at Glen Vale. The centre lane north of Kilgore is also reduced. Still...
 
Anyway, back down to Donlands/Pape/Millwood. First the *most dangerous* crossing ever. E-W green, while SB green (to Donlands and Pape, but only one lane). Yes, greens at 90°... slightly unsafe for pedestrians! (I've reported this to 311Toronto).
View attachment 592237View attachment 592238

WB Donlands at Millwood:
View attachment 592239View attachment 592240

And machinery in NB Millwood, presumably to work on the bike lane on the bridge:
View attachment 592241View attachment 592242
Unrelated but looking at the last 2 photo's we have 1960's lights/infrastructure still there
 
The bridge was redone in the ?1990s?? I don't know if the lights were retained, or were deliberately kept of the style.
afaik that specific model of light is very old, I wish Toronto would upgrade to LED when repairing/redoing an area. They were installing old style lights in new projects as recently as last year
 
Yeah, it looks like they redid the sidewalk and curb here, if the intention is to narrow the lanes to slow cars down, they could have just made the sidewalk wider?
Yes, there are some of these lines on Adelaide & Richmond near Jarvis; there they are to show future curb line but I agree it is very confusing, esp. as extending the sidewalks out is not a small job and there are no actual plans to do it.
 
The bridge was redone in the ?1990s?? I don't know if the lights were retained, or were deliberately kept of the style.

It was last rehabbed in 2004/2005, so 20 years ago.

It hasn't had a true gut since it was widened in 1969.

****

afaik that specific model of light is very old, I wish Toronto would upgrade to LED when repairing/redoing an area. They were installing old style lights in new projects as recently as last year

Its not that old..........its a very slightly more elaborate version of the conventional cobra-style fixture that's been in use since the late 1970s.

I'm not sure when those lights date from, could be the '05 re-do, but I think they look older than that, maybe early 90s.

There were no cobra lights in the 1960s, never mind 1927 when the bridge was built.

***
I would like to see them converted LED as well though, but I would prefer a more decorative pole and fixture for the bridge.

This is a picture of the bridge from 1928:

1725022149214.png

Credit James Salmon - Wikipedia: https://en.wikipedia.org/wiki/Leaside_Bridge#/media/File:LeasideMillwoodBridge.jpg
 
Last edited:
I was starting to wonder whether the Harbod/Hoskin cycling upgrades bundled with resurfacing and watermains was moving forward this year. Going to bid committee Wednesday. https://secure.toronto.ca/council/agenda-item.do?item=2024.BA93.10
Construction notice dated August 30. Work starts September 9, estimated completion October 6, 2025.
 

Back
Top