AlvinofDiaspar
Moderator
Report to the next TEYCC recommending approval for 'Alterations to a Designated Heritage Structure' in service of renovation to and restoration work on The Palm House.
The existing overhead glazing in the dome and cupolas is proposed to be replaced with laminated glass panelsto address safety concerns.The existing plate glass panes have occasionally fallen,posinga risk of injury.The overhead glazing is not original; it was replaced in 1975 with aluminum frames due to the deterioration of the previous wood frames. The proposed replacement glazing will be engineered so that it can be walked on, allowing for maintenance of the greenhouse. The glazing will have a ceramic frit pattern to diffuse sunlight. Currently, the overhead glazing is whitewashed in the summer to diffuse light and the frit pattern would eliminate the need for whitewashing going forward. The frit pattern is expected to have minimal heritage impact as it will be virtually transparent
Yes - we can finally see the sky instead of that perpetual overcast inside the Palm House because of the whitewash.
From the report:
AoD
Last edited: