Automation Gallery
Superstar
Another condo bldg. coming to this area.......has this location been posted yet.
Condo towers to loom over Church
Village real estate appears to be on the rise. Literally.
The widely advertised Five Condos are set to take over the site of former gay dance haven 5ive, and now plans for another condo development are confirmed in the same area.
A 25-storey condo tower is slated for the Dundonald/Gloucester block of Church St, the city’s planning division confirms.
Allison Meistrich, a senior planner at Toronto City Hall, says a proposal for a 25-storey condo tower has been submitted, which would see the demolition of 596 Church St (Gloucester Mansions), as well as a portion of 69 Gloucester St.
Bruce Hawkins, speaking for Meistrich, says more buildings on Gloucester could be torn down as well, though a part of 67 Gloucester will be preserved.
The tower will feature 35 replacement rental units on floors two to six and condos on floors seven and up. The proposal is still in the application stage, and a date of construction has not been set, though Hawkins says it will probably be "in the next 12 months."
More..........http://www.xtra.ca/public/Toronto/Condo_towers_to_loom_over_Church-8610.aspx
Condo towers to loom over Church
Village real estate appears to be on the rise. Literally.
The widely advertised Five Condos are set to take over the site of former gay dance haven 5ive, and now plans for another condo development are confirmed in the same area.
A 25-storey condo tower is slated for the Dundonald/Gloucester block of Church St, the city’s planning division confirms.
Allison Meistrich, a senior planner at Toronto City Hall, says a proposal for a 25-storey condo tower has been submitted, which would see the demolition of 596 Church St (Gloucester Mansions), as well as a portion of 69 Gloucester St.
Bruce Hawkins, speaking for Meistrich, says more buildings on Gloucester could be torn down as well, though a part of 67 Gloucester will be preserved.
The tower will feature 35 replacement rental units on floors two to six and condos on floors seven and up. The proposal is still in the application stage, and a date of construction has not been set, though Hawkins says it will probably be "in the next 12 months."
More..........http://www.xtra.ca/public/Toronto/Condo_towers_to_loom_over_Church-8610.aspx
Last edited: