drum118
Superstar
Before my time, but was raised a number of times at Mississauga Council that the work was to be done by 2011.According to whom?
Because there was never any EA, or funding, allocated to such a project.
Dan
Toronto, Ont.
There is 3rd tracks from north of the 403 to west of Confederation Dr that service Erindale Station and watch it being built, a 3rd track at Kipling for X distance that was mostly used by CP auto racks, a number of bridges saw the 3rd bridge built beside the existing one, Lisgar Station was built so the 3rd track could be added on the north side of the platform. There were changes to other locations as well.
If this happen in early 2000's, who pay for it and where was the EA for it??