  1. Highriser_CAN_AUT

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Morning @fanoftoronto - some "insider" news for you. That's a screenshot of the cross section where you can see what will happen soon. The formwork will be suspended from these massive blue I-Beams at the top. There will be rollers to ensure you can strip the formwork properly. 3 levels below...
  2. Highriser_CAN_AUT

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    I didn't but a friend of mine did. I worked on the Hudson Yards project in NYC as well as the CIBC Square, Bay and Adelaide, etc. in Toronto. I am glad too they are using something more advanced than traditional methods to build a tower. It's still a little strange how many towers are built...
  3. Highriser_CAN_AUT

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    So the thing is there will be an elevator core inside the Mega-Core (the one you see in all of the photos). No worries, the core at the exterior as well as the elevator core will be built out of concrete. You can't see the actual core for the elevators in the photos - there will be a floor crane...
  4. Highriser_CAN_AUT

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    You can have a look it up on the Doka Homepage: https://www.doka.com/en/system-groups/doka-climbing-systems/automatic-climbing-formwork/platform-scp/index#download-container There you can also find some videos/animations. That's the system which will carry all the CPB, Mini Crane, Formwork...
  5. Highriser_CAN_AUT

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Don't know if any of you want to guess what else is coming up in the elevator core?! There will be a concrete placing boom and mini crane attached to the top (blue gantry top structure) construction. I have waited for soooo long to get to this stage, since I was heavily involved in the...
  6. Highriser_CAN_AUT

    Toronto One Delisle | 155m | 44s | Slate | Studio Gang

    Does anybody know when they will start with the demolishing of the existing structure? Furthermore what the plan is until when they are going to start building the actual One Delisle building? Thanks. :)
  7. Highriser_CAN_AUT

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Wait until they have fully installed all the self-climbing formwork systems at the core and the perimeter. Once this is in place they will be flying to the top of the structure. :) And there will also be a huge surprise wrapping around the tower somewhen soon to protect the workers while glass...
  8. Highriser_CAN_AUT

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Do you want me to spoil the store which will open at ground floor or do you want to wait until they mount their Logo? ;)
  9. Highriser_CAN_AUT

    Vaughan Park Place VMC | 192m | 56s | SmartCentres | Hariri Pontarini

    Does anybody know a rough schedule of these Towers? Furthermore the status of the project - probably still pre-application stage with the City? Thanks guys.