Search results

  1. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    No. 31 Condos, so much going on and only a few weeks since I seen it last. Excavator down in the 31 hole and can only get a glimpse of the arm once in awhile so they are down almost 4 floors. Parliament has been closed at Front street with Road blocks. Must be tough on the Distillery with no...
  2. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    We were down looking at it last night. What were they thinking, design on facade on units. OMG, I hope it gets better.
  3. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    I had to Google this and read up on it. Not uncommon with 2 towers or any designs sharing the same shoring wall. 2 towers in Toronto did this and I found an article on the process. One side builds a temporary bracing made of steel once lower concrete is poured and cured.
  4. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    No. 31 Condos, May 06.2023. Slowing down and assume they are waiting until the shoring wall is supported on 33 Parliament side before digging.
  5. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    No. 31 Condos on April 15 th 2023. Quite the transformation quickly. Digging down now and sharing a wall between 31 & 33 buildings. They dug down on the east end and filled back up with fresh gravel. Must have too much water coming in. But things moving fast.
  6. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    No. 31 Condos on March 18 th 2023. Started to drill on the north wall and that will complete all retaining shoring walls. If the site was wide enough they would have started digging down. Really get a good perspective of the width at the back with steel sticking up out of the ground.
  7. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    No. 31 Condos on March 12th 2023. South and East retaining walls completed, and this really puts building size in perspective. Standing at South/East corner looking North in first photo.
  8. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    Started working on drilling of east side of lot this week. Looks like they completed drilling, steel beams and concrete on the south side.
  9. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    No. 31 Condos second week of drilling and both drilling rigs still working on south side of lot.
  10. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    My point was everyone arriving at the Distillery wants to pour into the parking on the south side. We go 3 times a week at least and during the summer each evening. I know where to park as I lived in the area for years. But it's visitors that think the only available parking is the south side of...
  11. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    Only one Green P parking left in the area. Ontario government took all of them away on Parliament. Dug them up and fenced them off for the new subway line. Distillery District parking garage is all that's left and what a disaster trying to attend anything now in the area.
  12. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    I've already asked these questions. Parking at No 31 is very limited. So limited it's cut out possible lockers. Parking is strictly residents of No 31. And all the present parking between Distillery District and Goode condo is going away as the new Ontario subway line is below that area. The...
  13. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    No. 31 Condos 3 days later, February 02.2022 still going strong. 6 cement trucks on site at a time and 2 shoring drilling rigs both running.
  14. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    No. 31 Condos going like a house on fire this week. Also they got approval of the easement relocation. They have 2 Shoring/drilling machines going, one on south/east side and one south/west side and both are right up against the CN rail retaining wall. So the driveway between 33 Parliament and...
  15. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    Moving Forward. Issued January 18
  16. Brickworks

    Toronto 31R Parliament Street | 165.8m | 49s | Cityscape | SHoP

    31R is still a parking lot being used by the Distillery District. Back parking lot used to store Christmas buildings, Planters for summers. All parking lots will be gone when Goode condo and 31R condo completed. First floor of underground parking in Goodie condos will be Green P parking for use...
  17. Brickworks

    Toronto No. 31 Condos | 137.4m | 41s | Lanterra | Arquitectonica

    Finally the Shoring can begin. Partial Permit - Shoring. Stopped in on my way by at 1pm today. The site supervisor introduced himself during the demolition of previous buildings and he's onsite today with a huge crew. They still haven't announced ground breaking but things are moving forward.
  18. Brickworks

    My images posted are 31 Parliament land. Not Goode condos

    My images posted are 31 Parliament land. Not Goode condos
  19. Brickworks

    I think you should go down to 31 and 33 Parliament and stand on the property so you know what is...

    I think you should go down to 31 and 33 Parliament and stand on the property so you know what is 31 and what is 33.