  1. A

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    April 18:
  2. A

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    April 18 - Looking forward to this one as it grows:
  3. A

    Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

    April 16:
  4. A

    Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    When Pinnacle first arrived in Toronto, which I believe was for the condominium development on the north side of Harbour Street, between Bay and Yonge Streets, construction was started without pre-sales. The sales suite for the four tower project was set up while the first building was under...
  5. A

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    From yesterday, April 10: Installing some of the final glazing sections in the Tridel Signature condominium building.
  6. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    From yesterday, April 10: Lots of activity at the King Bathurst station site - in particular for the south side. Two shoring rigs drilling constantly - at one point there were three concrete trucks at the site to fill the newly drilled holes. In addition to all work on the site itself, a...
  7. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    From yesterday, April 10. Continuing the Front Street sidewalk work.
  8. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    From yesterday, April 10:
  9. A

    Toronto King Portland Centre and Kingly Condos | 57.6m | 15s | Allied | Hariri Pontarini

    From yesterday, April 10: No - thankfully this is not a patio enclosure on King Street frontage, but temporary protective hoarding while the ground level glazing is being redone to relocate the former Ascari and Luv restaurant front entrances for the new King Taps setup.
  10. A

    Toronto 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    April 8 - 160 Front during the partial eclipse. Note the still non-working section of the north-west corner led lighting.
  11. A

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    From April 6, Saturday Evening:
  12. A

    Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    From April 6 - Saturday evening:
  13. A

    GO Transit Electrification | Metrolinx

    Given the April 19, 2022 date for signing of the contract with the consortium for the Go Transit project, including the electrification components, and given that it is now coming to the end of the two year development phase, perhaps it will soon be time to upgrade the Go Transit...
  14. A

    Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Yes, it is fixable. There are at least three more sets of escalators under construction, and are actually clearly visible when looking at the areas which are not yet open. One set is at the east end of the food court, by the health centre (lower ground to ground levels), one set is at the west...
  15. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    April 4 - Working on the West Mountain this morning:
  16. A

    Toronto 2010 Yonge | 59.8m | 14s | Sud Group | Graziani + Corazza

    April 3 - Activity on site - ground sample drill rig working away.
  17. A

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    My mistake - I had thought that Reliance was the forming contractor. Did not realize they were GC for the project. My understanding, from staff on site at Central, was that Concord was their own GC on that project.
  18. A

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    Some background from my perspective. When Concord Adex came to Toronto and started the CityPlace development they hired professional general contractors. The initial buildings on Front Street, the Matrix (361 and 373 Front Street) and Apex (381 and 397 Front Street) were built by Toddglen...
  19. A

    Vaughan Festival Condominiums Phase 2 | 148.85m | 45s | Menkes | Turner Fleischer

    I gather this news release should have been posted in this thread: DEVELOPERS BREAK GROUND AT BRAVO, THE NEXT PHASE OF FESTIVAL IN VAUGHAN METROPOLITAN CENTRE MENKES AND QUADREAL START CONSTRUCTION ON THE NEXT PHASE OF THE LARGEST MIXED-USE DEVELOPMENT IN VMC Menkes Developments Ltd...