News   Jul 12, 2024
 792     0 
News   Jul 12, 2024
 715     0 
News   Jul 12, 2024
 304     0 

Search results

  1. M

    Toronto Ryerson Student Learning Centre | 50.59m | 8s | Ryerson University | Zeidler

    The north wall was not given windows or other features as there's an expectation that Yonge Street will continue to intensify and larger buildings to the north will eventually be built. Those buildings will block any windows or features that may have been incorporated into the north wall. M.
  2. M

    Toronto Ryerson Student Learning Centre | 50.59m | 8s | Ryerson University | Zeidler

    Two construction milestones for the Ryerson Student Learning Centre this week - the first of three green roofs has been planted and the crane dis-assembly has begun:
  3. M

    Toronto Ryerson Student Learning Centre | 50.59m | 8s | Ryerson University | Zeidler

    The cement portion of the north wall will get a graphic treatment that picks up on the frit pattern in the glass as well as Ryerson University signage. I'll see if I can find a rendering that I can share with the forum as well as info about the materials involved. M.
  4. M

    Toronto Ryerson Student Learning Centre | 50.59m | 8s | Ryerson University | Zeidler

    Went on a tour of the SLC last week, thought I'd share a few more interior photos of the interior and rooftop. The on-going glass install: A look through the frit glass Panorama of rooftop construction
  5. M

    Toronto Ryerson Student Learning Centre | 50.59m | 8s | Ryerson University | Zeidler

    Additional photos from Ryerson Thought I'd post some additional images that we didn't run in our photo gallery in Ryerson Today: an additional look at the glass install and two photos of the interior.

Back
Top