    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    im 13th of phase one as well! im the 500sqft unit facing south near the south west corner, any chance we are direct neighbors? rob
  2. B

    Condo Upgrades

    builder upgrade vs. post move-in upgrades vs. ??? so i've read through some of this thread but not all so forgive me if this question has been answered. I was curious if anyone has asked a builder simply to not do a floor finish or not do a ceiling finish at all. This is what i have...
  3. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    I just wanted to point out that they have started redoing the façade of the towers on the north-east side of landsdowne and dupont. It would appear that they are applying a stucco finish (probably with added insulation) to the first tower that borders lansdowne. I was sorta hoping they were...
  4. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Aug 17th Site Update Another site update as they are busy as bees. I'll let the pictures do most of the talking but here's a quick summary: -erected crane on poured concrete platform -continue pouring foundation and footing concrete in main pit -bored holes on north perimeter against...
  5. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    site update with pics I thought i'd post some pics of the site as there has been a noticeable development. Mainly, they have delivered a bunch of rebar and formwork wood and are beginning to set it up in the north-west corner of the lot. They have started a section of formwork for the...
  6. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    dig update just another update from the site: - excavation has stalled for the moment - a temporary electrical room was constructed on the north side of the lot - the electrical room was hooked up to a job-site trailer that was delivered - they also did some more exploring around the...
  7. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    dig update no time for pics but this is what happened this week on the phase 1 site: - the topsoil from the entire site was excavated and piled up on site - surveyors staked out the site for the excavation - a plywood perimeter fence was erected around some of the site - excavation on the...
  8. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    is there a City Planning Preliminary Report available for Phase 1 & 2? Could anyone link to this document if it exists. thanks rob
  9. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    here is a picture of them doing the soil test. I wonder if it's because they are so delayed that they had to do another test. It's logical that something may have changed since last year in the soil. they might just have been checking the level of spring thaw, however. rob
  10. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    not nothing there were two dudes in suits out on the property yesterday peering into the hole that is our future condo. If I were a betting man I'd say one of them was Falus and that they were making a call on whether to start digging again. I wouldn't be surprised to see them start up again...
  11. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    mortgage approval request! not sure what that foundation permit means but... In other news, i got a call the other day asking for proof of a mortgage application approval. I went into the office and overheard her saying that because of the economic downtown they are requiring confirmation...
  12. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    letter I'd be willing to sign the letter if it helps. I honestly believe our investment is not in jeopardy but i do think the developers could use some motivation to make the whole process more transparent and perhaps more expedient. I feel the pain of those who purchased early and might...
  13. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Phase 1.... Section 1.04 a) states the "tentative occupancy means the 30th of Sep 2010" Section 2.09 a) says the "selected (occupancy) date shall not not be more than 24 months from the tentative occupancy date" Section 10.01 states "the closing date shall be... the later of... 1) the...
  14. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    from what i can tell from my purchase contract, the developers have until late 2012 to complete the project... i.e. that is the latest possible closing date and would be 24 months (2yrs) behind schedule at that point. It would not be unreasonable, considering the construction is in its infancy...
  15. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    well sorry to be the bearer of bad news but nothing has been touched on the site since my last post and they removed the excavator several days ago. If anybody is in contact with the developers or the construction company then maybe we can inquire as to what the delay is. rob
  16. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    For some reason (maybe the heat?) there was absolutely no work done at the site this week. Even last week when they were working, it seemed like they were going super slow and inefficiently... they had two trucks carrying away dirt but it would be 20 minutes in between loads where the digger...
  17. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Admittedly the standard loft apartments aren't the finest rental facilities in the city, i know because i live in the northwest building. However, there is a good diversity of people living here just as there is in the rest of the neighborhood. It is miles better than the towers on the north...
  18. B

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    the hole grows Just a quick update on the dig. The hole is about twice as big as in my last update but pictures don't really convey that. Digging has been delayed by the recent rain and now they seem to be waiting for the pool of water at the bottom of the hole to dissipate before resuming...

Back