    Toronto Grainger | 124.5m | 40s | Fitzrovia | Turner Fleischer

    Looks like samples are being collected today
  2. R

    Toronto The Globe and Mail Centre | 83.21m | 17s | First Gulf | Diamond Schmitt

    Crane Installation Crane Installation has started. It looks like there will be two cranes installed on the site based on the visible concrete foundation pads. The northern crane is partially installed. Will see how quickly they get them in.
  3. R

    Toronto Parliament Street Data Centre | ?m | 5s | BRL Realty | WZMH

    Why would anyone invest in building a datacentre on such expensive land? Many large datacentres are being relocated to locations outside of Toronto where land is cheaper, power is more readily available and the site more easily secured and less prone to disruption.
  4. R

    Toronto King East Centre | 140m | 39s | First Gulf | WZMH

    Great gulf / toronto sun development open house and seminar GREAT GULF / TORONTO SUN DEVELOPMENT OPEN HOUSE AND SEMINAR Hi everyone I noticed Great Gulf put flyers advising of a Public Open House and Information Seminar scheduled for Wednesday May 30th at 7 pm to 9 pm (tomorrow). It will be...
  5. R

    Toronto St Lawrence Condos at 158 Front | 91.44m | 26s | Cityzen | a—A

    There is a community consultation meeting scheduled for January 16 -7-9pm in the Basement of Little Trinity Church, 425 King St East. The developer is appealing their application to the OMB and has revised the original proposal (24 and 34 storey towers) and is now proposing two 26 storey towers...
  6. R

    Toronto King East Centre | 140m | 39s | First Gulf | WZMH

    Street Closures coming for 3 storey addition to Sun Building 1. CLOSE PRINCESS STREET BETWEEN ABBEY LANE AND FRONT STREET EAST FOR FIVE DAYS FROM OCTOBER 26, 2011 TO NOVEMBER 2, 2011; 2. CLOSE PRINCESS STREET BETWEEN KING STREET EAST AND FRONT STREET EAST, AND OCCUPY THE NORTH CURB LANE OF...
  7. R

    Toronto King East Centre | 140m | 39s | First Gulf | WZMH

    National Bank With National Bank going in on the NW part of the sun building, wonder what will go in SE corner of building next to the LCBO/Dollarama
  8. R

    250 Front St. E (Greenpark Homes, 12 + 2x 46s, SvN)

    I face east towards this site, so am hoping that the new building will not be an eyesore. Would be a shame considering the proximity to the first Parliament site
  9. R

    Toronto King East Centre | 140m | 39s | First Gulf | WZMH

    I saw the notice on the building indicating that an application had been submitted to increase the height of the western part of the building. Never heard anything else about it. Is there any idea of timeline for this to happen?
  10. R

    Toronto East Lofts Condos | ?m | 12s | Harhay | a—A

    New retail tenant I have heard that Scotiabank will be moving into the unoccupied retail space at ground level.
  11. R

    Toronto East Lofts Condos | ?m | 12s | Harhay | a—A

    I thought Kiosk was moving into the main level of the TCHC building on the North side of King next to the SAS building.
  12. R

    EAST Lofts Condos (Harhay Construction) - Real Estate -

    The condo declaration that was included with the agreement of purchase and sale states (Article IV (c)) "All shades or other window coverings shall be white when visible from the to present a uniform appearance the exterior of the building." It all depends on how strict the future condo board...
  13. R

    Toronto East Lofts Condos | ?m | 12s | Harhay | a—A

    We currently have concrete floors in our loft and haven't noticed any fatigue. The surface is less forgiving than hardwood if you drop things
  14. R

    EAST Lofts Condos (Harhay Construction) - Real Estate -

    Your unit looks great, very good layout, maximizes your available space! You must be excited to move. The sliding glass doors looks very nice. You have nice light and a view of King St.
  15. R

    Toronto East Lofts Condos | ?m | 12s | Harhay | a—A

    Lobby Floors The Lobby floors are grinded concrete that is very durable and non-slip. I think it is suitable for a "loft" lobby. This type of finish was offered as an upgrade to individual unit owners but the builder shared that our unit is the only one in the building with the floors finished...
  16. R

    Toronto East Lofts Condos | ?m | 12s | Harhay | a—A

    Lobby The residential lobby is looking very nice, fully clad in white backpainted glass panels, very dramatic all the way up to the ceiling. I spoke with the security guard and he mentioned that at least 7 people have moved into the building.
  17. R

    EAST Lofts Condos (Harhay Construction) - Real Estate -

    Size difference If you ask the builder I think you will be given the option to get out of your purchase agreement, which is not something you want to do since your unit has increased in value since you purchased it. You should still ask the question.
  18. R

    EAST Lofts Condos (Harhay Construction) - Real Estate -

    East Construction Update November 30, 2009 To All Purchasers of Units at 275 King Street East, Toronto, Ontario RE: East Lofts – Construction Update 275 King Street East Dear Purchaser; We wish to provide you with another update on the construction progress at East. Elevators are...
  19. R

    EAST Lofts Condos (Harhay Construction) - Real Estate -

    move in date I was at the site this past weekend there were a lot of appliances being delivered. I expect that they will give us individual move in dates maybe after the pre-delivery inspections since not everyone can move on the same day.
  20. R

    Toronto East Lofts Condos | ?m | 12s | Harhay | a—A

    Expiration date on views facing east Thanks for the update. I would imagine that if part of the site were to be redeveloped, it would be where the old printing presses are located at the north end of the site. My unit faces east so I will be nervously watching for a public notice of...