    Toronto Nicholas Residences | ?m | 35s | Urban Capital | Core Architects

    Crane going up today. Will try to take pictures later.
  2. O

    Toronto U Condominiums | 183.79m | 56s | Pemberton | a—A

    Concrete pour The big pour was almost done by the time I took this picture at 6pm. I have to say that this whole operation was turning a lot of heads on Bay st. on Saturday.
  3. O

    Toronto U Condominiums | 183.79m | 56s | Pemberton | a—A

    09-Feb-2012 Looks like the construction ramp is being removed.
  4. O

    Toronto U Condominiums | 183.79m | 56s | Pemberton | a—A

    I was talking with one of the site workers over the holidays and he told me they still have about 3 meters of digging before the crane comes in. At that time he was saying they should resume digging sometimes in January.