News   Apr 17, 2026
 733     0 
News   Apr 17, 2026
 1.6K     6 
News   Apr 17, 2026
 706     0 

Search results

  1. M II A II R II K

    Dundas St Rapid Transit (Metrolinx, Mississauga, Halton Region, CoT)

    Will the BRT corridor extend all the way to Kipling terminal, and if so would other busses be allowed to use its separated lanes east of 427.
  2. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    The drag factor of the surface section trickling into the tunnels no doubt.
  3. M II A II R II K

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    Too bad the east end of the Dundas West platform couldn’t have had a connection also.
  4. M II A II R II K

    Finch West Line 6 LRT

    Sydney’s new LRT was bemoaned for taking over 50 minutes when it started but now only takes over 30 minutes so there’s hope yet.
  5. M II A II R II K

    TTC: Other Items (catch all)

    The article didn't give a timeline as to when they will start being be rolled out.
  6. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    It's a low capacity subway with the drag factor of the onstreet section.
  7. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    They'll at least give updates every couple of months.
  8. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    So summer officially ended and there's no opening date.
  9. M II A II R II K

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    Surely the Halton museum would take at least one of them.
  10. M II A II R II K

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    https://www.cp24.com/news/toronto-transit-riders-group-to-hold-memorial-rally-on-wednesday-for-scarborough-rt-line-1.6530266
  11. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    https://www.blogto.com/city/2023/08/toronto-financial-woes-delay-eglinton-crosstown-lrt-ontario-line-opening/
  12. M II A II R II K

    TTC: Automatic Train Control and Subway Platform Screen Doors

    Line 1 station to get platform edge doors: https://twitter.com/i/web/status/1664386855050018817
  13. M II A II R II K

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    I wonder if Line 5 will appear on the LED maps.
  14. M II A II R II K

    Toronto Bloor–Danforth Line 2 Scarborough Subway Extension | ?m | ?s | Metrolinx

    If they are going to shut the RT down anyway they could have saved time and built the subway in the RT corridor's place.
  15. M II A II R II K

    Ontario Line Extension West of Ontario Place (Speculation)

    There would have to be a wait and see as to how the improved GO would work out in order to determine where best an extension could go.
  16. M II A II R II K

    Sheppard Line 4 Subway Extension (Proposed)

    This probably won't be a priority until at least the 2030s so we probably won't ride such extensions until about 2050.
  17. M II A II R II K

    Transit Fantasy Maps

    Once up on a time there was a loop extension to bypass Union and have Line 1 go down to Queens Quay.

Back
Top