News   Jan 10, 2025
 1K     2 
News   Jan 10, 2025
 1K     0 
News   Jan 10, 2025
 568     0 

Search results

  1. Streety McCarface

    Danforth Line 2 Scarborough Subway Extension

    Building LFLRT on Eglinton Ave and Don Mills should not be deemed "sensible" by any measures. Also, converting a high-floor rapid transit service to a low-floor one, while it has its benefits, is not "sensible" either tbh.
  2. Streety McCarface

    Danforth Line 2 Scarborough Subway Extension

    Imagine thinking this poll isn't biased based on its target audience, the phrasing of questions/answers, the lack of an option for LIM, the lack of representation by the individuals that would actually use the service, and the fact that the sample size is far too small to have any sort of merit...
  3. Streety McCarface

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I did for half a year, along with at least 100 other people that left through the north access road, and another 150-200 that left through the south access road. With a new Menkes development opening up just across the 407, I can guarantee a bunch more people will too.
  4. Streety McCarface

    GO Transit: Service thread (including extensions)

    This is pretty standard in Canada and the US, and yes, that's exactly what they're fearful of. Lawsuits for god knows what are very common here, so if some dumbass decides to drive into a tower, and something bad happens (Falling infrastructure, damage to a tower, or even just the driver...
  5. Streety McCarface

    GO Transit: Service thread (including extensions)

    Liability and access...it's not more complicated than that. All the major utility providors (Enbridge, Hydro One, Bell/Rogers/Telus, etc) are like this, especially Enbridge and Hydro One because there's so much danger with their utilities. ,
  6. Streety McCarface

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Quit mentioning this, we've already discussed this like 5 times. No one knows what the design of the OL's interchange at Science Center is going to look like. Why on Earth would we complain about it when we don't even have a design? Also, if it's a 4 story vertical transfer, I guarantee you...
  7. Streety McCarface

    Broadview Extension Environmental Assessment (City of Toronto)

    Rosedale and Summerhill maybe, but anything in the Annex and West of the Annex is all transit users. It's a shame the dupont streetcar no longer exists.
  8. Streety McCarface

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Stick with the TTC font...Why waste millions of dollars changing all the maps in the name of accessibility when additional elevators and ramps are much better for said accessibility?
  9. Streety McCarface

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    So a rapid bus gets its own logo but the subway does not? For christ sake... Also, they should use the TTC font. It's distinctly Toronto and would make these roundals stand out more.
  10. Streety McCarface

    Metrolinx: Other Items (catch all)

    W — Lakeshore West E — Lakeshore East M — Milton B — Barrie K — Kitchener S — Stoufville R — Richmond Hill U — Union Pearson Future M — Midtown P — Peterborough The only one that doesn't work is Bolton. Regardless, this is all arbitrary, as it was with the TTC nomenclature update. Give it a...
  11. Streety McCarface

    Roads: Ontario/GTA Highways Discussion

    The HOV lane expansion is a resurfacing of the entire 401 between RR 25 and Credit River. None of the freeway has a concrete base. Source: I'm looking at the drawings right now.
  12. Streety McCarface

    Roads: Ontario/GTA Highways Discussion

    This is not happening on the 401 HOV lanes expansion through mississauga and milton, and there is nothing in the OPSS that states the particular roadway design, that is up to the Contracting Authority.
  13. Streety McCarface

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    No, it really makes it clear as to why the eastern portion should have been elevated. - Minimal redevelopment potential in many areas, especially around the don valley - No homes within a close enough proximity for it to be an issue - Poor intersection design (access/egress) - Usage of...
  14. Streety McCarface

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    And cities, such as LA, Boston, Denver, Philadelphia, and Newark don't exist? Because those cities also have either electrified regional rail, a subway system, or both. And yet Wilson, Yorkdale, Sheppard West, Eglinton West, and Lawrence West still get great ridership. You can very easily...
  15. Streety McCarface

    YRT/Viva Construction Thread (Rapidways, Terminals)

    Factoring in inflation at the start of construction, the use of only 2 TBMs, and the fact that the Sheppard subway was bare-bones built, the cost of the TYSSE and Sheppard subway are pretty similar.
  16. Streety McCarface

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Those slow sections are still accounted for in the average speed of the line, so this is a moot point.
  17. Streety McCarface

    GO Transit: Construction Projects (Metrolinx, various)

    Good god, why is there a UPX platform at this station...
  18. Streety McCarface

    YRT/Viva Construction Thread (Rapidways, Terminals)

    Lets stop using full lifecycle costs and instead use CAPITAL Costs like normal people: Hurontario LRT CAPITAL cost: 2.1 Billion ECLRT CAPITAL cost: 5.3 Billion Hurontario CAPITAL Cost/km — 2.1B/18 km = ~117 M$/km ECLRT CAPITAL Cost/km — 5.3B/19km = ~279 M$/km It should be noted that over half...
  19. Streety McCarface

    TTC: Other Items (catch all)

    No, the issue is that you only have to pay 2.75 to go 30 miles (50 km) in their system, and the fact that they have a huge bus network.

Back
Top