    Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

    July 30 - Two new items at 88 Bathurst. First, privacy partitions are being installed on the sides of balconies where they project out from the neighbouring suites. Secondly, plantings are in place on the north side of the terrace where the tower floors go up from the podium.
  2. A

    Toronto 467 Wellington West | 60m | 16s | SmartCentres | Turner Fleischer

    SmartCentres made a settlement offer to the City in advance of the City's July 24th Council meeting. Settlement offer, the most material point of which was to reduce the number of floors and the height of the proposed building, including mechanical penthouse to 17 floors and 60 meters, was...
  3. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    July 27: The north side of King Street project is moving very quickly. Both the side (north-south axis) girder structures are now largely complete. The first two photos are from Friday mid-day, and the rest are from today (Saturday afternoon, around 3:45 PM) - the Saturday crew still working...
  4. A

    Toronto Ontario Line: Queen-Spadina Station | ?m | 1s | Metrolinx | HDR

    Friday, July 26. Several changes in the perimeter areas of the site. North of Queen Street the original sidewalk up Spadina has been reopened under the protective hoarding. A 'permanent' construction access gate has been set up at the north edge of the site on Bulwer Street. Utility work...
  5. A

    Streetcar Tracks on Adelaide

    From July 26 - early afternoon (approximately 1:15 PM). Not a worker in sight, nor any work vans / trucks. Possibly they are working after hours / overnight / weekend - or some other problem? Meanwhile, the position / elevation profile of the drain in the third photo below looks like it might...
  6. A

    Toronto QueenChurch | 185.9m | 57s | Tridel | Kirkor

    July 26: Demolition and heritage stabilization and retention activities completed, and the general contractor, Delterra, has started on the site. Shoring for the excavation is underway.
  7. A

    Toronto Concord Canada House | 231.97m | 74s | Concord Adex | Arcadis

    July 26 - From Spadina and from our balcony (Wellington and Portland area):
  8. A

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    From yesterday, July 25 - Rebar delivery being lifted into the site. Ongoing concrete work as well.
  9. A

    Toronto KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    July 26. A lot is going on at the King Toronto site - some of it associated (or coincident ) with the anticipated start of the glazing referred to by A Torontotonian Now above. First of all, a Clifford Heritage Restoration crew was on-site all day yesterday. It looks like all the brackets...
  10. A

    Toronto Ontario Line: King-Bathurst Station | ?m | ?s | Metrolinx | HDR

    With all due respect, while I am not a construction of engineering person, from my perspective: 1. The curved girders were not installed yesterday - they were still sitting on the ground this morning. 2. There is no way structural steel 'I' or 'H' beams, with substantial flanges along each...
  11. A

    Toronto Toronto House | 186.53m | 58s | Westbank | Hariri Pontarini

    Changed - I did not realize I could update the thread title - thought it had to be a UT Administrator. When I went back to my original post which created this thread (almost ten years ago) - found that I could still edit it, including the title. Thanks for suggesting....
  12. A

    Toronto 543 Richmond Street West | 47.24m | 15s | Pemberton | BDP Quadrangle

    July 24: Work on the parkette is proceeding, but does seem to be taking its time. Overview pictures, followed by views of the parkette.