Some concrete pouring for the Yonge St sidewalk was done today, along with the corners where the latest hangers were installed. Some of the forming for level 60 flooring were also installed.
Today, there was a lot of noise from a vac truck working the sidewalk area on Yonge St. Also, they placed the forms up to hold up level 60. Level 59 seems to be back to the standard floor plan: