News   Jul 25, 2024
 757     0 
News   Jul 25, 2024
 675     0 
News   Jul 25, 2024
 509     0 

Search results

  1. T

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    sure. I moved in in April 2006, and my unit was on the 5th of 15 floors. My closing was mid-October 2006. SO about 6 months. If I had moved in on a higher floor it would have been a lot less. Ergo why I bought higher up this time around! The delays are usually a result of getting the...
  2. T

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    I bought in Phase II...closing date on agreement is December 21, 2012...LOL...(i.e. the exact date the Mayan calendar says is the end of time...). Well, if the world DOESnt end, I'll have bought me a condo!!!! Thanks for the updates everyone. BTW: This is the second time I am buying from...
  3. T

    Toronto Yorkdale Shopping Centre | ?m | ?s | Oxford Properties | MMC Architecture

    Agreed, but I think one of the challenges to redevelopment on Yorkdale's land of any height will be complicated by the presence of Downsview Airport which imposes height restrictions...probably why condos were never developed here, like at almost every other GTA mall.
  4. T

    Toronto Yorkdale Shopping Centre | ?m | ?s | Oxford Properties | MMC Architecture

    I think this is great but I wonder about how popular the undergr\ound parking will be instread of structured parking.
  5. T

    Toronto South Beach Condos + Lofts | ?m | 27s | Amexon | Arsenault

    this is the developer (Amexon's) first residential project, and the principal of the company is a very enthusiastic guy who always expressed a desire to make this a quality landmark project...so I think he will follow through on the details.
  6. T

    Toronto South Beach Condos + Lofts | ?m | 27s | Amexon | Arsenault

    I agree. It was VERY tight with three buildings; but I can still remember the issues when we deleted it. The retail along Park Lawn will be very interesting. The separate commercial building from the residential towers is a response to the requirement for a 30 metre setback and buffer from...
  7. T

    Toronto South Beach Condos + Lofts | ?m | 27s | Amexon | Arsenault

    Heights I worked on these approvals back in 2006 when I worked for another planning firm. Was my first big planning project. Sat through the whole OMB hearing too!!! They are 29 stories each. Originally there were 3 towers but it got scaled back.

Back
Top