News   Jul 25, 2024
 561     0 
News   Jul 25, 2024
 608     0 
News   Jul 25, 2024
 477     0 

Search results

  1. bro-arch

    Mississauga 185 Enfield | ?m | 35s | GWL | Kirkor

    curious to see how it comes together once the podium cladding gets added. I like how the tower is coming along and want to see the railings get added.
  2. bro-arch

    Toronto U of T: Schwartz Reisman Innovation Centre (Phase 1) | 64.8m | 13s | U of T | Weiss/Manfredi

    Some do, but usually on smaller buildings that have terraces that store the davits when not in use, and are used at multiple location (there will be slots to insert along the roof). These particular ones looked fixed with the ability to rotate so they will always be there. Regardless, still a...
  3. bro-arch

    Toronto U of T: Schwartz Reisman Innovation Centre (Phase 1) | 64.8m | 13s | U of T | Weiss/Manfredi

    I love how this turned out, my only complaint is I wish they went with a rail system for their window washing equipment instead of the davits. All those cranes at the top take away a bit from the profile.

Back
Top