News   Jul 19, 2024
 938     0 
News   Jul 19, 2024
 4K     7 
News   Jul 19, 2024
 1.2K     4 

Search results

  1. drum118

    miWay Transit

    July 11 to Sept 19, Route 26 is on Detour from Duke of York To Robert Speck with Burnhamthorpe Intersection Close to Traffic At Hurontario St for Guideway construction. ML notice shows nothing for the 26 other than traffic using Central Parkway Notices sent out by ML as well signs up on...
  2. drum118

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    You can see part of the north plug gone on Sunday that I shot. They could had parked where the new Don Roadway connects to Commissioner or the close bike lanes at the east end of the bridge or a layover further to the west, but too lazy and thinking they are more important using the sidewalk.
  3. drum118

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    ML has had blinders on when it has come to stop locations as well station names. Then they only believe stops should be located where connecting transit lines exist and fail to look at stops that generate more ridership than bus stops. Elm Drive generates a lot more ridership than CP as well...
  4. drum118

    Toronto The Goode Condos | 111.4m | 33s | Graywood | a—A

    July 08 More up on my site
  5. drum118

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    July 07 The last of the photos for the area are online now Small amount of the old Cherry St bridge footing still to be remove
  6. drum118

    Waterfront Transit Reset Phase 1 Study

    July 07 2 Planters at each ends
  7. drum118

    VIA Rail

    VIA Rail Canada unveils specially painted corridor trainset
  8. drum118

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    No Fairview stop that I know of at this time and you will have to go to the north side of CP to get the LRT. If one is there, it will be on the northside and would support the Kingsbridge stop that ML opposed in having one there since it will see more ridership than Fairview. John St stop is on...
  9. drum118

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    July 07 Very slow getting the new westbound Lake Shore E built and was expecting to see more done then what has taken place. No sidewalk in place on either side as well. Piers are being formed for the new Don River bridge and hard to say if the steel beams for the new bridge will be place on...
  10. drum118

    TTC: Flexity Streetcars Testing & Delivery (Bombardier)

    July 10 4621 has enter service on 503 today after been off loaded June 18 22 days ago 4622 was out testing last night
  11. drum118

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Have yet to see one and not surprise to see this considering it now 7 months late from the January notice. It will be either later 2025 or early 2026 for service. It took then a year to do the southbound. We may see the northbound lanes open between May to July 2025, then another 2 months to...
  12. drum118

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Danforth was built in the 60's along with Bloor when TTC was making a profit and had no service standards like today. Danforth died after streetcars were removed compared to Bloor that thrive after the removal. If one walk from Broadview to Main today as well 10 years ago, let along in the 80's...
  13. drum118

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Your 2nd photo shows a base for the new tunnel wall being built and where it will connect to the sidewalk wall to the north. Don't see a base for the wall from the Mary Fix Creek wall that is to connect to the push box wall. Looks like a base for the raise sidewalk which is odd. since the...
  14. drum118

    GO Transit: Construction Projects (Metrolinx, various)

    There was a plan for the existing GO/VIA station over a decade or so ago with GO staying where it currently is or moving to the eastside of Trafalgar and no idea what happen to it. The land north of the station was also part of it up to the QEW. NO Frills had a large store across from the GO...
  15. drum118

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Thanks. The road will slope from the Lake Shore to the Commissioner Bridge
  16. drum118

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    July 07 The Don Roadway No idea how thick the concrete base is as well how deep they went considering the area was still at grade when I last saw it
  17. drum118

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    July 07 Took me many attempts to get back down to the area as the weather was against me when I had time since my last visit. Lot more up on my site Was planning on shooting a lot more of the area, but after 5 hours in the heat, the sun and walking, call it a day. Part of the north plug removed
  18. drum118

    GO Transit Electrification | Metrolinx

    It will be platform 27 Gauntlet tracks require more space between tracks in the ROW and which one will have it that has the leases impact on GO service as well fitting it in?? There are lines in the US that use the gauntlet track for DMU services as well LRT. More stations means more switches...
  19. drum118

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    ask someone with a walker who is a slow walker as well someone with a cane or a wheelchairs. If you have young children, try walking that distance with then a few time. the 34 will have a bitch of a time traveling that single lane

Back
Top