  1. D

    Waterfront Transit Reset Phase 1 Study

    and i'm sitting here opening up this thread every time there's a new post foolishly thinking there will be an update on the west side rip
  2. D

    Toronto Ontario Line 3 | ?m | ?s

    hey remember when using different technology than TTC subway it would save money? pepperidge farm remembers
  3. D

    Toronto Park Lawn GO Station | 12.83m | 2s | First Capital | Hatch

    it's being built with phase 1 of 2150 Lake Shore. Part of that phase is the new street which is currently undergoing an EA for the rail underpass and that one will be submitted to the city in the fall.... and THEN they do 30% design for the road soooo it feels like we're still at least 1-2...
  4. D

    GO Transit: Service thread (including extensions)

    why does it look like they're just applying a giant metal brick (assuming thermally conductive) to act as a heatsink
  5. D

    Toronto 1025 The Queensway | 149.6m | 46s | Talisker | WZMH

    If I recall, this is or at least used to be their best performing theatre in the chain as was the case when it was originally near Sherway, especially after Westwood shuttered so at one point it wasn't overbuilt. Perhaps these days it is. this area is brutal for everyone it sucks on cars...
  6. D

    GO Transit Electrification | Metrolinx

    transitioning from electric locomotive + bombardier bilevels to EMUs of some kind in the future you will have fully loaded trains no matter what, what will be different is how many... and the answer is not much as i said you wouldn't conceivably be able to just because you'd need two single...
  7. D

    GO Transit Electrification | Metrolinx

    they said "That's an 8 year window where we potentially go from a very congested trains" and i'm showing it's incredibly unlikely to reach that and crush capacity is just to show that even if there was a potential for capacity to be reached on the first few trains, ongoing capacity would far...
  8. D

    GO Transit Electrification | Metrolinx

    i just want to say how unlikely it would be for them to really hit capacity even by then 12 car trains at crush load with 5 minute headway theoretically on all 7 lines just for one hour every day would over *quadruple* GO ridership without accounting for a single other passenger... and that's...
  9. D

    GO Transit Electrification | Metrolinx

    wouldn't you want people at bay and not york? or am i misunderstanding the "latter" part lol
  10. D

    GO Transit Electrification | Metrolinx

    go train running at subway frequency feels so weird lol
  11. D

    GO Transit: Service thread (including extensions)

    apparently the trains are at capacity at union before they reach the other stops on lake shore line woopsie
  12. D

    Toronto 105 Thirty First | 13.4m | 4s | Petrogold | KLMA

    even though its kind of dorky its got that 90s vibe and i dig that but i don't really understand the whole ground floor patio and windows right below it thing
  13. D

    Finch West Line 6 LRT

    33 minutes for 18 stops is roughly comparable to the subway speeds of line 1 and 2.
  14. D

    Toronto 210 Islington | 85.47m | 26s | Taheri | Icon

    holy smokes that's big for the area edit: YES finally some retail thank you unlike merlin residences on the other side of the block, this one is on purely industrial road and arterial road and there is no houses this can possibly impact they should just approve it, let's kickstart some...
  15. D

    Toronto Scotiabank Arena Renovations | ?m | ?s | MLSE | BBB

    they not changing the upper concourse?
  16. D

    King-Queen-Roncy Intersection/ROW

    so they're ahead of schedule, nice!
  17. D

    King-Queen-Roncy Intersection/ROW

    how long until streetcar service is expected to be operational west of roncy?
  18. D

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    why won't they even commit to 2024 jeez
  19. D

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    lmao the press are going IN this is getting spicy project is at $12.56 billion right now
  20. D

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    seems like this conference is to be a justification for delays they are not providing a date today because of the amount of issues they keep finding