  1. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    They are now up to the 13th floor. Any ideas when the cladding will start to arrive?
  2. K

    Toronto X2 Condominiums | 160.93m | 49s | Lifetime | Wallman Architects

    Drilling / shoring has begun. They have started in the southwest corner of the site.
  3. K

    Toronto X2 Condominiums | 160.93m | 49s | Lifetime | Wallman Architects

    Drilling / shoring equipment is being assembled on site today. My guess is they will have started the process by the end of the week.
  4. K

    Toronto X2 Condominiums | 160.93m | 49s | Lifetime | Wallman Architects

    It may be sooner than that. They appear to be assembling some type of crane on-site today, and there is now a trailer/office on site.
  5. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    A lot of progress has been made since the last pic was posted. They have started the flooring for the next level of the parking garage.
  6. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    The crane is currently being installed.
  7. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    The pit has been poured and the base for the crane looks ready. I suspect the crane will go up in about a week.
  8. K

    Toronto X2 Condominiums | 160.93m | 49s | Lifetime | Wallman Architects

    It looks like some digging has begun on the site today.
  9. K

    Toronto X2 Condominiums | 160.93m | 49s | Lifetime | Wallman Architects

    They are drilling ground samples today. This is the first activity I've seen on this site since the Pizza Pizza building was torn down.
  10. K

    Toronto X2 Condominiums | 160.93m | 49s | Lifetime | Wallman Architects

    More demolition on the former Pizza Pizza office is happening today. They've taken out most of the back of the offices facing Jarvis.
  11. K

    Toronto X2 Condominiums | 160.93m | 49s | Lifetime | Wallman Architects

    Demolition has begun. The Victorian houses are currently being torn down.
  12. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    Trees were planted today in the garden setup along Jarvis by the artwork.
  13. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    Some large red beams were delivered this morning. It looks like they will be installing them on a small concrete slab that the prepped yesterday. Is this functional or is it going to be artwork?
  14. K

    Toronto X The Condominium | ?m | 44s | Great Gulf | a—A

    One of the concrete pillars is now black.
  15. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    A lot of activity on site today. Digging and drilling, dump trucks and cement trucks.
  16. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    They have started the drilling today.
  17. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    It's either a hammer or a crane drill - http://www.deepfoundations.ca/Equipment.aspx#
  18. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    Some crane-like looking equipment has been delivered to the site, and they are currently setting it up. Since no digging has been done, I assume this is not a crane, but maybe a drill for core samples?
  19. K

    Toronto Couture The Condominium | ?m | 42s | Philmor | Graziani + Corazza

    The last section of the sales office is being removed from the site today. Does anybody know when they start to dig?