News   Jul 15, 2024
 385     0 
News   Jul 15, 2024
 514     1 
News   Jul 12, 2024
 2K     1 

Search results

  1. H

    Toronto Ontario Line 3 | ?m | ?s

    Do not get off at the Science Centre station to go to the Science Centre. Flemingdon Park is way closer.
  2. H

    Sheppard Line 4 Subway Extension (Proposed)

    How about both lines serving both stations at Sheppard and STC? That way, those who are heading east on Sheppard as far east as possible (McCowan), those who want to go to STC will not need to transfer, and the line can easily extend east on Ellesmere if needed. The potential for cross-platform...
  3. H

    Metrolinx: Sheppard East LRT (In Design)

    1. Build the Ontario Line to Sheppard (Don Mills Station), 20+years 2. Close the Sheppard Subway 3. Build a new Sheppard Subway from Sheppard West to McCowan with the Ontario Line technology, 30+years
  4. H

    GO Transit: Service thread (including extensions)

    https://www.gotransit.com/en/trip-planning/go-service-updates/train-schedule-changes Stouffville Line Service changes start October 14 Looks like they are adding 3 mins to each trip, shifting the schedule a bit, reducing delays caused by the constructions along the Stouffville Line.
  5. H

    Toronto Ontario Line 3 | ?m | ?s

    Metrolinx could technically just take the playground.
  6. H

    TTC: Other Items (catch all)

    https://static1.squarespace.com/static/5f31983105399b71d5495df1/t/5f6e1fda0248e16876b9559d/1601052640322/TTC+2021+Annual+Service+Plan+Discussion+Guide.pdf
  7. H

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Does anyone have a list of all the future turn restrictions along the at-grade sections?
  8. H

    GO Transit: Service thread (including extensions)

    Also looks like the Yonge North Subway Extension IBC will be published soon.
  9. H

    GO Transit: Construction Projects (Metrolinx, various)

    And Metrolinx used an image from Cooksville GO for the Old Cummer GO work.
  10. H

    TTC: Other Items (catch all)

    Anyone who is accepted in a focus group of the TTC new subway train? just wondering.
  11. H

    TTC: Other Items (catch all)

    https://www.ttcannualplan.ca/ TTC is seeking feedback on Jane and Eglinton corridor.
  12. H

    TTC: Jane (LRT) RapidTO

    https://www.ttcannualplan.ca/ TTC is seeking public opinion on service pattern along Eglinton and Jane corridor.
  13. H

    Jane Street LRT (2041 RTP)

    Yes there is a thread already: https://urbantoronto.ca/forum/threads/ttc-jane-lrt.7294/ And the letter is recommendations from the LTL Group, not necessary "information" on phase one. The only appearance on the Jane LRT is on the 2041 RTP as with dozens of other projects.
  14. H

    YRT/Viva Construction Thread (Rapidways, Terminals)

    Plus the infrequent services.
  15. H

    YRT/Viva Construction Thread (Rapidways, Terminals)

    ^And it will widen the headways because of increased travel distance to the terminal. Route 16 that will get 24 mins service in September will probably be 26 mins by the end of the year.
  16. H

    Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    LRT can also have express/local if scheduled correctly and you are in Japan.
  17. H

    GO Transit: Service thread (including extensions)

    It's permanent, but the other 6 cars length is currently occupated by the SRT guideway. Once the Scarborough Subway extension opens, they will construct the rest of the platform.
  18. H

    GO Transit: Service thread (including extensions)

    Those bus trips to Peterborough have a "hold" symbol in their schedule, and should wait for the train and you.
  19. H

    GO Transit: Construction Projects (Metrolinx, various)

    Weirdly it doesn't have a switch from the new track heading towards Downsview Park

Back
Top